Feasibility assessment · Prepared by WSL
A measured survey — including one wall the scan missed — and an open decision model across four routes. Every number below is an editable assumption.
01 — What is actually there
02 — The space itself
Drag to look, scroll to zoom, right-drag to pan. No scan sees above a suspended ceiling — so the model cannot settle whether the missing wall reaches the slab. That stays a site-visit item.
03 — Reading the plan
Two corrections to the survey come first, because they change the answer.
04 — The four real options
Clean, repair, photograph and market it furnished, with no building work involved.
Paint, flooring, lighting, AC service, new entrance and signage. The layout is untouched, so no permits are needed.
Route B plus removing the 5.3 m partition. Restores one ~76 m² open floor.
Sell it by the seat, month to month. Silsilah stops being a landlord and runs a business.
05 — The decision model
Where the numbers land
—
| A · As-is | B · Refresh | C · Open up | D · Operate | |
|---|---|---|---|---|
| Up-front spend | — | — | — | — |
| Months before first income | — | — | — | — |
| Stabilised income, per year | — | — | — | — |
| Effective rate, SAR / m² / yr | — | — | — | — |
| Year one, net of spend | — | — | — | — |
| Payback on the spend | — | — | — | — |
| Five years, net of spend | — | — | — | — |
| Gain over Route A | baseline | — | — | — |
| WSL fee, if this route is taken | — | — | — | — |
06 — Before anything is committed
Each of these can move the numbers above by more than any assumption in the model. They are the agenda for the next meeting with Silsilah, in roughly the order they matter.
07 — Where we land
One hour closes most of step 6: who is occupying it, the wall above the ceiling, the door off the wet room, and the glass.
Pull live comparables for fitted offices of this size in Ar Ruwais and the surrounding districts, and reset the rent assumptions to them.
Two contractor quotes against a defined scope, so Route B's cost stops being a per-m² estimate.
Scope, timeline and the fee structure modelled above, put in writing before any work begins.